North Selby No. 1 shaft: proposed treatment of Ackworth Rock 526.4m-575m
A proposal regarding the treatment of Ackworth Rock at the North Selby coal mine. Prepared by the Cementation Mining Ltd.…
Gascoigne Wood Drift Site – WS Atkins Project Plan
A “coffee table” publication by WS Atkins, the main contractor for the Gascoigne Wood Drift mine site. Coal was transported…
Report on the Architectural Design of the Selby Shaft Sites
A “coffee table” publication dated May 1979 by architects Fletcher Ross & Hickling for the National Coal Board North Yorks…
Selby Coalfield Sites 2018
Selby coalfield, the largest and most modern in Europe, was developed between 1972 and 1984, and by 1990 was producing…